|
|
| MOQ: | 1Ton |
| Price: | 400-700 USD/Ton |
| Standard Packaging: | Standard package |
| Delivery Period: | 7 - 15 Days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20000Tons/Month |
| Process Stage | Technical Objective | Impact on "Rigidity and Flexibility" |
| Pre-rolling | Flattening the plate | Eliminates initial stress for uniform deformation. |
| Multi-stage Bending | Shaping into wave profiles | Each bend angle (e.g., 30°–60°) is controlled to avoid excessive strain. |
| Post-forming Cooling | Stabilizing the structure |
Rapid cooling (e.g., air cooling) enhances the plate’s rigidity. |
|
|
| MOQ: | 1Ton |
| Price: | 400-700 USD/Ton |
| Standard Packaging: | Standard package |
| Delivery Period: | 7 - 15 Days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20000Tons/Month |
| Process Stage | Technical Objective | Impact on "Rigidity and Flexibility" |
| Pre-rolling | Flattening the plate | Eliminates initial stress for uniform deformation. |
| Multi-stage Bending | Shaping into wave profiles | Each bend angle (e.g., 30°–60°) is controlled to avoid excessive strain. |
| Post-forming Cooling | Stabilizing the structure |
Rapid cooling (e.g., air cooling) enhances the plate’s rigidity. |