Brief: Learn how this solution can streamline typical workflows and improve reliability. In this video, we demonstrate the installation process of our hot-dip galvanized steel floor decking, showcasing its interlocking plug-and-play design that enables a 1000㎡ floor to be installed in just 24 hours with a 2-person team. You'll see how this permanent formwork system integrates seamlessly with concrete for industrial warehouses, commercial buildings, and prefabricated structures while meeting international compliance standards.
Related Product Features:
Hot-dip galvanized steel construction provides superior corrosion resistance with zinc coating options from 80-275g/㎡.
Interlocking plug-and-play design enables fast installation without temporary formwork, saving time and labor costs.
Supports large-span layouts up to 4.0m for industrial warehouses and load capacities up to 3.5kN/㎡ for commercial floors.
Lightweight construction weighing only 6-12kg/㎡ reduces transportation and lifting expenses.
Ribbed profile creates strong mechanical bonding with concrete slabs from 50-150mm thickness.
Customizable specifications including base thickness (0.8-2.0mm), profile models, and dimensions up to 12m length.
Compliant with CE, ISO 9001, ASTM A653, and AISI standards with material certificates provided.
Available with value-added options including anti-slip surfaces, color coatings, and pre-punched holes.
FAQs:
What is the typical installation time for a 1000㎡ floor using this steel decking?
A 1000㎡ floor can be installed in approximately 24 hours with a 2-person team thanks to the interlocking plug-and-play design that eliminates the need for temporary formwork.
What standards and certifications does this floor decking comply with?
Our steel floor decking meets CE, ISO 9001, ASTM A653, and AISI standards, with material certificates and test reports provided for every order to ensure global regulatory compliance.
What customization options are available for specific project requirements?
We offer comprehensive customization including base thickness (0.8-2.0mm), zinc coating levels (80-275g/㎡), profile models, dimensions, plus anti-slip surfaces, color coatings, and pre-punched holes for electrical routing.
What is the typical lead time for delivery?
Standard lead time is 30-35 days for FOB/CIF Qingdao Port, with stock available for standard models to accommodate urgent project timelines.